Maintenance of traffic

Results: 201



#Item
41AUSTRALIAN CAPITAL TERRITORY MOTOR TRAFFIC ACT 1936 DETERMINATION No37

AUSTRALIAN CAPITAL TERRITORY MOTOR TRAFFIC ACT 1936 DETERMINATION No37"OF 1990 Under Section 217A of the Motor Traffic Act 1936, I REVOKE all previous determinations of fees in so far as they relate to fees

Add to Reading List

Source URL: www.legislation.act.gov.au

Language: English - Date: 2014-02-26 20:31:13
42Latest Change in Vehicle Glass Requirements (April[removed]In Hong Kong, the requirements for safety glass in motor vehicles are stated in regulation 28 (reg.28) of Road Traffic (Construction and Maintenance of Vehicles) R

Latest Change in Vehicle Glass Requirements (April[removed]In Hong Kong, the requirements for safety glass in motor vehicles are stated in regulation 28 (reg.28) of Road Traffic (Construction and Maintenance of Vehicles) R

Add to Reading List

Source URL: www.td.gov.hk

Language: English - Date: 2015-03-05 02:24:43
43DEPARTMENT OF INFRASTRUCTURE[removed]standard specification for road maintenance miscellaneous provisions ■ provision for traffic ■

DEPARTMENT OF INFRASTRUCTURE[removed]standard specification for road maintenance miscellaneous provisions ■ provision for traffic ■

Add to Reading List

Source URL: www.nt.gov.au

Language: English - Date: 2015-02-09 18:08:39
44AUSTRALIAN CAPITAL TERRITORY MOTOR TRAFFIC ACT 1936 DETERMINATION OF FEES DETERMINATION NO. 56 OF[removed]Under Section 217A of the Motor Traffic Act[removed]REVOKE Determination No. 94 of

AUSTRALIAN CAPITAL TERRITORY MOTOR TRAFFIC ACT 1936 DETERMINATION OF FEES DETERMINATION NO. 56 OF[removed]Under Section 217A of the Motor Traffic Act[removed]REVOKE Determination No. 94 of

Add to Reading List

Source URL: www.legislation.act.gov.au

Language: English - Date: 2014-03-17 05:44:36
45Executive Summary The La Crosse County Roadway Plan documents Phase 2 of the Comprehensive Road Maintenance and Replacement Study. Phase 1 addressed pavement management, rehabilitation, and reconstruction of existing roa

Executive Summary The La Crosse County Roadway Plan documents Phase 2 of the Comprehensive Road Maintenance and Replacement Study. Phase 1 addressed pavement management, rehabilitation, and reconstruction of existing roa

Add to Reading List

Source URL: www.lapc.org

Language: English - Date: 2007-11-26 18:16:52
46ATTENTION: TP&D, DESIGN, CONSTRUCTION, MAINTENANCE AND TRAFFIC OPERATIONS ENGINEERS MEMORANDUM  Texas

ATTENTION: TP&D, DESIGN, CONSTRUCTION, MAINTENANCE AND TRAFFIC OPERATIONS ENGINEERS MEMORANDUM Texas

Add to Reading List

Source URL: ftp.dot.state.tx.us

Language: English - Date: 2010-12-03 12:04:59
47REVISED[removed]SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS – TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC The Contractor shall execute the item of Traffic Control as required by the Standard Speci

REVISED[removed]SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS – TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC The Contractor shall execute the item of Traffic Control as required by the Standard Speci

Add to Reading List

Source URL: www.scdot.org

Language: English - Date: 2015-01-28 08:49:23
48Title Author(s) The Charging Principle for the Development and Maintenance of Transport Infrastructure Nemoto, Toshinori

Title Author(s) The Charging Principle for the Development and Maintenance of Transport Infrastructure Nemoto, Toshinori

Add to Reading List

Source URL: hermes-ir.lib.hit-u.ac.jp

Language: English - Date: 2012-10-16 12:10:18
49Rule on Work Zone Safety and Mobility  Implementation, Maintenance, and Safety Guidelines  February 2, 2009

Rule on Work Zone Safety and Mobility Implementation, Maintenance, and Safety Guidelines February 2, 2009

Add to Reading List

Source URL: www.scdot.org

Language: English - Date: 2012-03-07 10:30:55
50QoS: Match ATM OAM The QoS: Match ATM Operation, Administration, and Maintenance (OAM) feature distinguishes control traffic from data traffic so that the control traffic can be protected from being dropped during interf

QoS: Match ATM OAM The QoS: Match ATM Operation, Administration, and Maintenance (OAM) feature distinguishes control traffic from data traffic so that the control traffic can be protected from being dropped during interf

Add to Reading List

Source URL: www.cisco.com

Language: English